My first project of the new year was the lino for the laundry floor. With the layers and layers of plywood and vinyl pulled up it was simply a matter of smashing the nails in a bit more, levelling the dips and holes with a patching agent and laying down the flooring. I had a day in mind to do the whole thing in one go, went to pick up my supplies and discovered they were out of flooring adhesive. So I bought what I could but didn't get the lino as I didn't want to be stepping over it for the week it would take to get the adhesive in.
Once the adhesive arrived I went to pick up the lino. I decided that since the space I needed to fill was 8x11 feet and the end rolls sold pre-wrapped were 8x12, what better solution than to just choose one of those? So I get the roll home and it sits for a couple days before I have time to get it laid out. While still in it's wrap I slid it into the laundry area by the back door. Huh. That's odd, did I mis-measure? It's 2 inches too short. Nope, *my* measurements are correct, the lino, however, is too short. So the day I was going to spend doing the lino turns into yet another day of not.
Then I dropped the trowel handle-first into the adhesive. Take a moment to imagine how that went.
I then stuck the other corner down and realized, too late, that is was not lining up properly, it was curled at the corner a bit which meant the whole roll was about a quarter inch crooked. Since it was taking so long to get the roll down the first corner was mostly dried and there was no moving it. I just sat for a moment and despaired, then carried on with a shrug and WTH.
I spent the next 45 minutes spackling down adhesive, unsticking my hand from the trowel, unrolling the lino, spackling down more adhesive, unsticking my hand from the trowel, and unrolling the lino. At about the three-quarters-done mark I dropped the trowel handle-first into the adhesive a second time. I was almost beyond sanity.
Eventually, I won the battle and managed to get the whole sheet stuck down to the floor. I put cans of paint along a couple edges to get them to lay flat to dry, gave the whole ordeal a sticky finger and went to bed.
The next morning things looked a lot better. Although I intend to refinish the kitchen floor I put down the threshold so that the edges of the lino don't curl up and get ruined.
I also put in the threshold, at last, across the dining door. The next project to finish off the laundry area and back door is to put in the baseboard. That will mean the entire area is relatively complete. I put a piece of plywood under the expen because I don't want it to mark up the flooring - especially after what I when through to install it. I hope one day to build an actual laundry room, which there clearly used to be, but for now this will have to do. The dogs give it their stamp of approval anyway.
I'd ROFLOL...except I don't want to get sticky. This makes me feel much better after a day of making holes in a new ceiling. And despite careful pre-measuring before the ceiling was up, still hitting joists and support studs...
ReplyDeleteIt looks great Tamzin.